|| Constructing CNG Stations & Gas Pipeline ||

Gas Pipeline Construction Works

The construction of a pipeline resembles a moving assembly line. Large projects are typically divided into manageable sections called "spreads," each handled by highly specialized and qualified workgroups.

Banner Banner

Route Survey

Route Survey identifies the optimal path for laying infrastructure like roads, pipelines, or cables.

Banner Banner

Route Cleaning

Route Cleaning involves removing obstacles along a designated path to prepare it for infrastructure development.

Banner Banner

Ditching

Ditching is the process of digging narrow trenches along a route for laying cables, pipes, or drainage systems.

Banner Banner

Pipe Strining

Pipe stringing is the process of laying out pipes along a designated route in preparation for welding and installation.

Banner Banner

Welding Of Pipes

Welding of pipes is the process of joining pipe sections together to form a continuous pipeline.

Banner Banner

NDT Testing

NDT Testing (Non-Destructive Testing) is used to inspect welds and materials without damaging them.

Banner Banner

Field Joint Coating

Applying protective coating to welded pipe joints on site to prevent corrosion.

Banner Banner

Pipe Lowering

Pipe Lowering is the process of placing welded and coated pipelines into pre-dug trenches with care to avoid damage.

Banner Banner

Back Filling

Back Filling is the process of refilling the trench with soil after the pipeline is laid to protect and stabilize it.

Banner Banner

CP Work

Techniques used to prevent corrosion in pipelines and metal structures.

Banner Banner

Hydrostatic Test

Hydrostatic testing is the process of filling a pipeline or vessel with water and applying pressure to check for leaks and ensure its strength and safety.

Banner Banner

Site Restoration

Site restoration is the process of returning a construction or work site to its original condition after the completion of the project, ensuring safety and environmental balance.

CNG / CBG Infrastructure
(Upgrade & New Outlet Construction)

Rencomm has started developing CNG and CBG infrastructures across various states with its experienced managerial and technical team expertise. Rencomm holds capacity to deploy civil and electrical teams for CNG construction sites in North, West, Central and East Region states in India. So far, Rencomm has successfully developed 12 plus upgradation and new retail outlet stations since FY 2024-25.

Infographics
Infographics

Equipment installation

  • Equipment unloading & installation.
  • Compressor & Cascade.
  • DU.
  • Tubing work with hydro test.
  • TPI inspection of Equipment and tubing installation.
  • Equipment testing and interface(for online station 15 days).

IT, Automation, HSE & Branding

  • Equipment testing and interface(for online station 15 days).

Branding & HSE

  • Installation of Bollard,FE,Sand buckets.
  • Fencing & Gates Installatione.
  • Installation of Safety signage's.
  • Driveway work.
  • Mechanical completion.

L3 Audit

  • Pre L3 & L3 Audit Callout.
  • L3 Audit.
  • Punch Point Liquidation of L3 Audit.

Our Services Include

CNG Station Development

We offer complete turnkey services for CNG station development, including equipment installation, pipeline setup, and operational commissioning. Our team ensures each station meets the highest standards of safety, efficiency, and compliance with all regulations, managing the entire process from site preparation to operational testing for successful, timely project delivery.

Testing & Commissioning

Our Testing & Commissioning services guarantee the safe and compliant operation of CNG stations, gas pipelines, and related infrastructure. We perform thorough safety tests, performance evaluations, and system integrations to ensure installations adhere to industry standards. Our detailed reports and certificates confirm systems are ready for commercial use while meeting all safety and regulatory requirements.

Pipeline Services

We provide comprehensive pipeline services, including route surveys, trenching, welding, and hydrostatic testing. Our team ensures gas pipelines are constructed to the highest safety standards and optimized for operational efficiency. From initial survey to final testing, we oversee every stage of the construction process, ensuring full compliance with safety and environmental regulations for reliable gas distribution.

Site Restoration

Our site restoration services focus on environmentally responsible post-construction cleanup. We clear debris, restore the site, and ensure minimal environmental impact. From landscaping to vegetation replanting, our team works to return the site to its original condition, adhering to industry standards for environmental protection and ensuring the land is safe and usable.

Why Choose Us?

Proven Track Record

Over 10 years of expertise in delivering reliable oil and gas infrastructure solutions.

Safety Assurance

Dedicated to zero-incident project execution, ensuring safety at every stage.